DOBOT CR20A
DOBOT
CR20A is a CRA collaborative robot. 20 kg maximum payload and 1700 mm working radius. A longer-reach arm to evaluate for carton handling and palletizing cells.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Maximum payload
- 20 kg
- Working radius
- 1700 mm
- Robot weight
- 73 kg
Tasks to consider
- Evaluate for carton handling
- Evaluate for palletizing
Before integration
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards. Include the vacuum tool in the load calculation and test the full pallet pattern, box surface and recovery sequence.
