DOBOT CR30A
DOBOT
CR30A is a CRA collaborative robot. 30 kg maximum payload and 1305 mm working radius. A higher-payload option for moving heavier parts within a fixed production cell.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Maximum payload
- 30 kg
- Working radius
- 1305 mm
- Robot weight
- 70 kg
Tasks to consider
- Evaluate for machine loading
- Evaluate for station-to-station transfer
Before integration
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards. Validate wrist torque, fixtures and guarding with the full tool and part mass.
