ESTUN S10-140 Eco
ESTUN
S10-140 Eco is a six-axis collaborative robot. 10 kg published payload, 1400 mm reach and 6 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Published payload
- 10 kg
- Reach
- 1400 mm
- Axes
- 6
Tasks to consider
- Evaluate for machine loading
- Evaluate for station-to-station transfer
Before integration
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards. Define operator recovery and record cell status.
