quindart
All hardware

ESTUN S3-60 Eco

ESTUN

S3-60 Eco is a six-axis collaborative robot. 3 kg published payload, 575.8 mm reach and 6 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Published payload
3 kg
Reach
575.8 mm
Axes
6

Tasks to consider

  • Evaluate for machine loading
  • Evaluate for station-to-station transfer

Before integration

Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards. Define operator recovery and record cell status.