FAIRINO FR20
FAIRINO
FR20 is a six-axis collaborative robot. 20kg (Max:25kg) published payload and 1854 mm reach. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Published payload
- 20kg (Max:25kg)
- Reach
- 1854 mm
- Axes
- 6
Tasks to consider
- Evaluate for machine loading
- Evaluate for controlled part transfer
Before integration
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards. Define operator recovery and record cell status.
