quindart
All hardware

FAIRINO FR3

FAIRINO

FR3 is a six-axis collaborative robot. 3kg (Max:5kg) published payload and 622 mm reach. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Published payload
3kg (Max:5kg)
Reach
622 mm
Axes
6

Tasks to consider

  • Evaluate for machine loading
  • Evaluate for controlled part transfer

Before integration

Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards. Define operator recovery and record cell status.