FAIRINO FR5-WML
FAIRINO
FR5-WML is a six-axis collaborative robot. 5kg published payload and 1900 mm reach. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Published payload
- 5kg
- Reach
- 1900 mm
- Axes
- 6
Tasks to consider
- Evaluate for machine loading
- Evaluate for controlled part transfer
Before integration
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards. Define operator recovery and record cell status.
